05. Apply additional coats or create the finish according to the selected system and desired effect.
Drying: Prepare the substrate so it is clean, dry, sound and suitable for the coating system.
Theoretical coverage: 13.5–18.5 m²/L; 10–13.5 m²/kg; 55–75 ml/m².